7 Steps to Home Improvement

Home Improvement Story: Decoration is laborious, and decoration is slimming and shedding. Decoration is to challenge the physical limit, and decoration Metal Garden Stakes is to test the psychological endurance... Before the decoration, let's understand the home decoration process:

1. Understand, compare and choose a decoration company

Organize ideas: coordinate and unify the ideas and opinions of family members, read more materials and cases, and preliminarily determine the style.*Windmill Garden Stake

Budget preparation: According to the family's financial situation, initially determine the decoration budget and make a fortune. Determine the upper limit of foreseeable basic items such as decoration and main materials and strictly implement it.

Tip: It is normal for the final account to exceed the budget by 10%, and it is not new if it exceeds 30%!

Selection method: The cleaning work is the most tiring, and the labor and materials are the most worrying. The main materials are still purchased by yourself, and the decoration company can handle the rest! Metal Garden Fence

There are two ways to choose a company for reference: a. Entrust a supervision company to bid; b. Go directly to the home improvement market to find a home improvement company.

Tips from Yunnan Housing Network:

It is a common practice to go directly to the home improvement market to find a home improvement company, which can make an intuitive comparison between the home improvement company and the designer's ability; entrusting the bidding form of the supervision company has not been generally recognized by the market, the reputation of the supervision company is one aspect, and secondly, most of the bidding companies are public decoration companies When entering the home improvement market, there is still a gap between the brand appeal and some home improvement companies. No matter which of the above methods you choose, it is recommended that you must not choose a street decoration team, otherwise there will be endless troubles.
//cdn.goodao.net/ekrhome/51NAH3EiJiL._AC_.jpg

2. Negotiate and finalize the decoration plan

Design proposal Put forward requirements, draw sketches, comprehensive communication, on-site measurement, provide construction and renderings, prepare and provide decoration budget.Gazebo Pergola

hint:

1. Most home improvement companies do not charge design fees separately, but the design will follow the rules and form a routine.Plant Stand Indoor

2. Some companies have paid designers. If you want to show off your personality and have ample funds, you can ask them to design individually, not only because these designers are generally experienced designers, but also provide full supervision and guidance for your home decoration. The general fee is 2000-3000 yuan, which is still worth the money.
//cdn.goodao.net/ekrhome/710brpJXmYL._AC_SL1500_.jpg3. Sign the decoration contract

Sign the contract Determine the decoration plan and materials, determine the project budget, determine the construction period, and sign the contract.

hint:

1. The budget provided by the home improvement company at this time is only the foreseeable project budget, and the structure demolition, piping and wiring, gypsum ceiling, lamp installation, etc. need to be calculated according to the actual measurement after the stage of the project is completed, remember!  Propane Fire Table

2. Beware of home improvement companies making false reports in the budget. It is recommended not to confirm the project budget on the spot. It is best to measure and recalculate the audit on the spot.

3. Carefully read the contract, and ask for an explanation on the spot or sign a supplementary agreement if the responsibilities and rights of the clauses are unclear.   Garden Wind Spinners

4. The contract signed should be a contract uniformly regulated by the relevant state departments. After signing, it should be identified or stamped by the market where it is legal and valid.https://www.ekrhome.com/single-decorative-metal-candle-lantern-13-candle-holder-with-glass-insert-and-wooden-base-ideal-for-table-centerpieces-banquet-wedding-decor-party-classic-patio-lantern-product/4. Construction, hire someone or supervise the work in person

Prepare

1. Check the living room - the flatness of the wall, ground and roof and the water supply and drainage pipes.

2. Check the unimpeded situation of electricity and gas, and make records

3. Material preparation.

4. Personnel scheduling. Determine the construction personnel and specify the person in charge of the construction site.

5. Workshop and on-site stakeout. Display construction drawings and construction production requirements.

The construction process of the decoration company

1. Demolition works Demolition: if

It is structural to complete the formalities. Handling: demolished garbage and waste materials. Cleanup: Clean up the construction site.

2. Hydropower and coal projects

A. The discharge of hot and cold water pipes and the installation of water supply equipment.

B. Emission of power supply, electrical appliances, telecommunications, and lighting lines, determine the location of the cassette, and position and install the switch and socket of the wire box.

C. Discharge installation of gas pipes and gas appliances.

3. Masonry works A. Bricklaying, partition walls, doors and windows B. Painting C. Clothes hanger installation.

4. Metal engineering A. Aluminum alloy doors and windows, plastic steel doors and windows installation. B. Anti-theft doors and windows, canopy installation. C. Clothes hanger installation.

5. Woodworking A. Production of wood products: door and window covers, wall panels, corner lines, ceiling partitions, kitchen utensils, entrances, etc.

B. Production of soft sleeper furniture (wardrobe, bookshelf cabinet, TV cabinet, shoe box, etc.).

C. Lay the floor, baseboard (board). D. Mosaic assembly of glass products.

6. Finishing project Paper paste wall, top paper (cloth), soft decoration production.

7. Painting project A. Batch embedded wall, top surface putty, paint. B. Putty embedded in wooden products. paint. C. Floor, baseboard (board) paint. D. The top of the wall is painted with latex paint.

8. Installation works

A. Electrical switch, socket panel installation, lighting installation.

B. Door lock, door bell.Wall Hanging Shelf,Rotating Magazine Rack

C. Sanitary ware three-piece set and hardware accessories (faucets, soap tubs, towel racks, paper boxes, bathtub handrails, mirror glass)

​D. Oil fume extractor, water heater, exhaust fan.

hint:

1. Projects at different stages are different, and the focus is on confirmation of materials, on-site supervision of key parts, and on-site inspection and acceptance.

2. Strictly control the progress of the project, select and purchase main and auxiliary materials in advance to avoid delays in the construction period.

3. For gas, plastic steel, flooring and other projects that need to be constructed by manufacturers, they should coordinate with the decoration team in advance to determine the detailed plan and avoid mutual referral of problems.//cdn.goodao.net/ekrhome/61udPAG2htL._AC_SL1001_.jpg5. Personnel or personal inspection and renovation

Space overall acceptance and renovation Wind Chimes Outdoor

1. Clean up the venue. The decorated rooms are cleaned room by room.

2. Check and accept according to the acceptance criteria (if rectification is required, then carry out inspection).

3. Provide pipeline circuit diagrams and warranty cards for equipment products.

4. Make a total settlement and issue an invoice based on the actual decoration quantity.

5. Issue the decoration engineering credit engineering warranty card.Floating Shelves Wall Mounted//cdn.goodao.net/ekrhome/8110tkAHwRL._AC_SL1112_.jpg
6. Fee Settlement

hint:

1. Carefully review various expenses calculated according to actual measurement, and re-examine all expenses according to the budget table to avoid double calculation. Pay to the decoration company according to the contract.

2. Everyone should consider the warranty period. Pay most of the renovations up front. It is best to settle all costs after the warranty period has passed.

7. Warranty, paid off

After the decoration service, after the warranty period, all expenses shall be settled with the decoration company.