Many times it’s hard to buy with money. If you know about decoration(Commercial Garment Rack), it’s always right to know more about decoration knowledge and experience in advance. Here are some decoration(Patio Umbrella Stand) experience and precautions summarized by those who have been here. Most of them have knowledge about hard decoration. There is a certain degree of professionalism. If you know a thing or two, you will not be easily deceived. Friends who are planning to decorate remember to collect it!
picture
hydropower
1. Concealed projects are the most important places that cannot save money: such as water circuit renovation and waterproofing.
2. After the "water and electricity transformation" of kitchen and bathroom is completed and the tank is sealed, the next step of "waterproofing" can be carried out.
(1) "Waterproof" has different construction methods according to different materials. Generally, it is best to do the waterproofing of the bathroom at the top, and the waterproofing of the kitchen is generally done at a height of 1 meter. One time is enough, and the waterproof of the door pocket needs to cover the door edge.
(2) After the waterproofing is finished and dried, conduct a "water test" test for 48 hours. After 48 hours, go to the next floor to check. If there is no wet mark on the ceiling, it can pass. Otherwise, it needs to be redone for waterproofing Floor. The place where water leaks most easily is the "floor drain".
3. The pressure test of the water pipe after the water pipe is drained is also very important. During the test, everyone must be present, and the test time should be at least 30 minutes, or an hour if conditions permit. 10 kg of pressure, and finally no reduction can pass the test.
5. The slope of the bathroom floor should be considered before laying bricks. The slope according to the national standard cannot achieve the effect of rapid drainage, and if you use an odor-proof floor drain or an ultra-thin floor drain, it will greatly increase the difficulty of drainage.
6. The triangular valve should not be omitted, and it will not save much money. If there is a triangular valve, installing the triangular valve can detect whether there is any water leakage at the copper joint in advance. If it is not installed, only the final installation of the faucet to connect the pipe to the copper joint It is only at this time that you can check whether the internal connection installed at that time is leaking, because the water leakage always needs to be pressurized for a period of time before it can be tested, and it is not safe to install the internal connection and the faucet at the end.
7. PPR pipes are not only suitable for cold water pipes, but also for hot water pipes, and even pure drinking water pipes. The interface of the PPR pipe adopts hot-melt technology, and the pipes are completely fused together, so once the installation pressure test passes, there will be no water leakage. And the PPR pipe will not scale. PPR pipe is known as never scale, never rust, never leak, green high-grade water supply material.
8. Lessons for installing the faucet The pipes connected to the faucets of the bathtub and shower are pre-buried in the wall. I have repeatedly told them to make sure the size is correct, so as not to fail to install it when the time comes. As a result, the distance between the hot and cold water pipes was 15 centimeters, but the hot and cold water pipes were not parallel, and it took a lot of effort for the plumber to install them. Yesterday, I found that the coating of my fb's GROHE thermostatic faucet was actually cracked. If you can install the faucet first, install it first. It should be to buy the faucet first, then install the hot and cold water pipes, and install the tiles.
9. Before installing the cabinet, be sure to confirm whether the waterway in your home is OK.
10. The strong current and the weak current should be piped separately. It is best if they can be separated, and the distance should be kept more than 10 cm, but it is not easy to do, because most families open a slot to save costs.
11. Arrange the wiring reasonably according to your actual needs. In some places, you can’t save it. For example, beside the bathroom mirror, you need to use the hair dryer and razor frequently; Shoe dryer, I now regret not having this thread.
12. When routing the wires, think about the position of the air conditioner, and move the power supply as close to the air conditioner as possible, so as not to see a section of the power line when installing the air conditioner, leaving a trace of regret.
13. For the electric water heater in the bathroom, it is advisable to use a two-stage switch with one plug. If you want to turn off the electric heater, it is dangerous to pull out the plug.
14. The dome light in the bedroom should preferably be dual-controlled, one next to the door and one next to the bed, so as not to get up and turn off the light after lying in bed in winter.
15. There must be more sockets on the TV background wall(Floating Shelf Brackets), TV, DVD.... Once you put it on, you will find that the sockets are not enough.
16. The light switch at the entrance is recommended to use the induction type. Go home in the dark, so as not to get in the dark17. Be sure to pay attention to the following points when laying tiles:
① It is best to be on site.
②Part of the less perfect tiles can be pasted by workers in places that cannot be seen in the future, such as behind cabinets(Wall Mount Shelf), sinks, mirrors, etc., and attention should also be paid to prevent tiles, waist tiles, etc. I can't see it, and it's a waste of money.
③ Wall tiles and floor tiles must be soaked in water for enough time before they are pasted.
④ Be sure to plug the floor drain with something to prevent the cement from falling down and clogging.
⑤ People are on site, workers will not waste too much tiles.
18. Regarding the processing method of the external corner of the facing brick, in the final analysis it depends on the level of the workers. If the level of masonry workers is good, and the tools for grinding tiles are better, they should choose to grind at a 45-degree angle without hesitation. From the effect point of view, as long as the grinding is good, the method of grinding the sun angle at a 45-degree angle is the most beautiful!
19. White cement should not be used for pointing joints of tiles. It will turn into black joints within a month, which is ugly.
20. The carpenter's door cover and the mason's tile tiling also need to cooperate. When wrapping the door cover, it is necessary to consider whether the ground below (either side of the ground on both sides of the door) needs to be tiled or other cement mortar leveling. Because if the door casing is nailed before the tiles are attached, it will be wrapped to the ground. When cement is used in the future, if the cement and the door casing are stained, it will cause the wood of the door casing to absorb water and swell.
21. After the door cover is done, the water conservancy engineer will start to install the plaster lines and criticize the gray on the wall. For flat walls, 2-3 coats are fine. When criticizing the dust, it is necessary to criticize the dust once and polish it once, then apply the primer, and then polish it again after brushing, and finally use ICI to brush the surface and paint it twice, so that the entire wall looks smooth and even.22. Measure and record the available sizes in the house by yourself. You can cover the size on the floor plan and then re-mark it. The final size will directly affect the decoration design and furniture purchase. the
23. It is best to look at the main furniture such as sofas, wardrobes, dining tables and chairs, and cabinets in advance. If you run around, you will be too tired. You can find a few large home plazas with a good shopping environment. The basic trend depends on came out, so the next thing you have to do is to slowly filter out the right things according to the style you envision. Some people have a good grasp of the style, while others have a good grasp of the color. It doesn’t matter. Anyway, there is still time to think about it. If you wait until the decoration is cleared and the vacant space is waiting to go to the furniture, it is inevitable that you will reluctantly accept it instead of liking it very much.
Post time: Dec-16-2022